skip to content

Faculty of Economics

CWPE Cover

Newbery, D. M.

Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors

CWPE1513

Abstract: In the energy trilemma of reliability, sustainability and affordability, politicians treat reliability as over-riding. The EU assumes the energy-only Target Electricity Model will deliver reliability but the UK argues that a capacity remuneration mechanism is needed. This paper argues that capacity auctions tend to over-procure capacity, exacerbating the missing money problem they were designed to address. The bias is further exacerbated by failing to address some of the missing market problems also neglected in the debate. It examines the case for, criticisms of, and outcome of the first GB capacity auction and problems of trading between different capacity markets.

Keywords: capacity markets, renewables, procurement volume, interconnectors

JEL Codes: L94 D44

Author links: David Newbery  

PDF: https://www.econ.cam.ac.uk/research-files/repec/cam/pdf/cwpe1513.pdf

EPRG Paper Link: 1508

Open Access Link: https://doi.org/10.17863/CAM.5709